Parexel – Parexel House, Nottingham

A property built in 1998, Parexel House is one of the facilities that supports life science companies across the globe, for one of the largest clinical research companies in the world.

The Assignment

Parexel facilities harbour energy saving and carbon reducing initiatives in order to keep their carbon footprint enviably low. As part of their continued journey, Parexel researched new and innovative technologies that would support their global sustainability targets. They chose to integrate Ecopilot at their Nottingham facility, an already energy efficient building.

Customer

Parexel

Building

Commercial Offices

Area

5.611

Installation year

2018

Building Framework

Brick/Sandstone

Type of Building

Office

Savings

15.1% on total building electricity
45.4% on gas consumption
1,260 MWh’s in 12 months

Carbon reduction

264.64 tonnes of CO2

Yield

133%

133%

Yield on invested capital

15%

Energy saving electricity

45%

Energy saving heating

264

Reduction CO2 tonnes/year

Solution

Q1 included a period when unusually hot weather should have resulted in increased cooling costs, however the site benefitted from an electricity saving of 30 MWh’s, as well as having a significant impact on base load gas consumption. Q2,3 and 4 continued to exceed the guaranteed minimum savings for both gas and electricity consumption. Climate complaints from occupants have also significantly decreased. All has been achieved through Ecopilot automatically, pro-actively and dynamically optimising the HVAC in real time, in accordance with the needs of the building and its users, whilst assisting the Parexel facilities team and their M&E and BMS contractors to improve the HVAC operation on site.

Results

As part of the verification process, Parexel used independently sourced data to validate the results presented to them. These confirmed the expected savings Ecopilot promised to deliver had been exceeded. Ecopilot’s initial assessment guaranteed an ROI of 2 years or less. The results confirmed that the payback on Parexel’s investment was only 9 months!