Habo Kommun – Alléskolan
Newly built elementary and middle school in Habo municipality. The school has approximately 450 pupils and 60 employees.
Assignment/solution
In connection with new construction of the school, Ecopilot® was installed to over-modulate the existing system in the building. This aims to prevent technical systems from counterbalancing each other and to utilise the thermal inertia of the building.
Customer
Habo Kommun
Building
Alléskolan
Area
5.615
Installation year
2012
Building Framework
Concrete/wood
Type of Building
School
Savings
Heating: 13 kWh/m2
Carbon reduction
3 tonnes CO2/year
Yield
26%
26%
Yield on invested capital22%
Energy saving heating3
Reduction CO2 tonnes/yearResults
Deficiencies in the newly-installed equipment have been identified and rectified during the warranty period. In addition, the actual energy usage is much lower than estimated.
Energy classification
Alléskolan now has a B-classification in accordance with the European standard for energy efficient buildings. This corresponds to 50–75 per cent of the new construction requirement for premises.