Regionfastigheter – Huskvarna healthcare centre

A newly-constructed district healthcare centre in Huskvarna. The property houses health care and dental operations as well as a maternity welfare clinic.

Assignment/solution

The property owner was unable to sort out the installed systems in this newly-constructed property. Ventilation, heating and cooling systems did not function together. Ecopilot® was installed to over-modulate the existing system.

Customer

Regionfastigheter

Building

Huskvarna healthcare centre

Area

10.472

Installation year

2013

Building Framework

Concrete

Type of Building

District healthcare centre

Savings

Heating: 16 kWh/m2
Electricity: 5 kWh/m2

Carbon reduction

20 tonnes CO2/year

Yield

25%

25%

Yield on invested capital

35%

Energy saving heating

10%

Energy saving electricity

20

Reduction CO2 tonnes/year

Results

The property broke the trend from a rising curve to significantly declining energy consumption. The property’s systems now work together and utilise the building’s thermal inertia. Several energy saving measures have also been identified in the property and these can improve profitability further.

Energy classification

Huskvarna healthcare centre now has a C-classification in accordance with the European standard for energy efficient buildings. This corresponds to 75–100 per cent of the new construction requirement for premises. Without an Ecopilot® installation, Huskvarna healthcare centre would have a D-classification.

Related references