Kungsleden – EA Rosengrens Gata

An office building in southern Gothenburg built in the early 1990s. The building has several different tenants with different types of operations.

Assignment/solution

Ecopilot® was installed as an over-modulation of the existing system. The background to this was the identification of problems with system collaboration and the indoor climate.

Customer

Kungsleden

Building

EA Rosengrens Gata

Area

4.324

Installation year

2012

Building Framework

Concrete

Type of Building

Office

Savings

Heating: 25 kWh/m2

Carbon reduction

8 tonnes CO2/year

Yield

40%

40%

Yield on invested capital

41%

Energy saving heating

8

Reduction CO2 tonnes/year

Results

The heat consumption has reduced by approximately 40 per cent and at the same time the indoor climate has become more pleasant. Now the property’s systems do not step on the gas and break unnecessarily.

Energy classification

EA Rosengrens Gata now has an A-classification in accordance with the European standard for energy efficient buildings. This corresponds to less than 50 per cent of the new construction requirement for premises. Without an Ecopilot® installation, EA Rosengrens Gata would have a C-classification.

Related references