Harry Sjögren – Cedern

A former textile industry property which has now been converted into an office building. The property is located by the bridge Centralbron in central Borås.

Assignment/solution

The property owner was interested in the innovative Ecopilot® system. It resulted in us being assigned to install Ecopilot® which over-modulates the property’s existing control system and optimises the ventilation, heating and cooling system.

Customer

Harry Sjögren

Building

Cedern

Area

7.339

Installation year

2013

Building Framework

Brick/Concrete

Type of Building

Office

Savings

Heating: 25 kWh/m2

Carbon reduction

10 tonnes CO2/year

Yield

45%

45%

Yield on invested capital

26%

Energy saving heating

10

Reduction CO2 tonnes/year

Results

The property owner is highly satisfied with the saving outcome. But the best effect is the improved control of the indoor climate which Ecopilot® Analysis has provided. This installation, which was a test from the start, resulted in Ecopilot® being installed in several of the customer’s properties.

Energy classification

Cedern now has a C-classification in accordance with the European standard for energy efficient buildings. This corresponds to 75–100 per cent of the new construction requirement for premises. Without an Ecopilot® installation, Cedern would have a D-classification.

Related references